Does a wood balcony get the same waterproofing as a concrete one?

In the manufacturer's design, both decks get a cement-based deck coating. The layers underneath differ because the deck below is a different material.

At Cache Roofing, we waterproof wood-framed and cast-in-place concrete balconies and elevated decks. The waterproofing systems we use are Pli-Dek and Sealoflex. This comparison covers the Pli-Dek build-ups.

Pli-Dek is made from polymer-modified cement with an acrylic admixture.

The top layer is a textured, slip-resistant walking surface that comes in several colors.

How is the coating built on a plywood deck?

On plywood, the joints are taped and metal reinforcement is fastened down before any cement goes on. From the bottom up, the layers are:

  1. Seam tape. Reinforced, water-resistant tape goes over the joints between plywood sheets.
  2. Metal lath. Galvanized metal lath is fastened to the plywood as reinforcement.
  3. Base coat. This is a polymer cement coat made of sand and cement mixed with an acrylic admixture.
  4. Intermediate coat. The manufacturer lists a fiberglass mat with an elastomeric acrylic resin for this layer.
  5. Screed coat (optional). This cement layer is used when the surface needs leveling.
  6. Finish. This is the surface people walk on.

According to the manufacturer, the plywood system is designed for high-traffic pedestrian balconies, roof decks, walkways and stairs. The manufacturer also states that it:

  • carries a 1-hour, Class A fire rating
  • is Florida Building Code approved (ICC ESR-2097)
  • is rated at 6,000 psi
  • is UV resistant

These are the manufacturer's statements. The requirements for a particular project are confirmed with the local building department.

What changes when the deck is concrete?

In the manufacturer's concrete system, the seam tape and metal lath drop out. A fiberglass mat saturated with elastomeric acrylic resin is the reinforcing layer, and a moisture primer can be added at the bottom.

The manufacturer calls its Pli-Dek system for concrete decks Con-Dek. From the bottom up, the manufacturer lists:

  1. Epoxy primer (optional). This is used where moisture comes up through the concrete.
  2. Primer coat.
  3. Fiberglass mat. The mat is saturated with an elastomeric acrylic resin.
  4. Polymer cement finish coat. It has the same finish options as the wood version.

The manufacturer lists the concrete system as 1-hour, Class A fire rated. It also lists it as Florida Building Code approved, including for the High-Velocity Hurricane Zone. As with the plywood system, these are the manufacturer's listings, and project requirements are confirmed with the local building department.

Plywood vs. concrete deck coatings side by side

Criterion Plywood deck (Pli-Dek for plywood) Concrete deck (manufacturer's Con-Dek)
Base material Basically cement with an acrylic admixture Basically cement with an acrylic admixture
First layer Reinforced water-resistant seam tape over plywood joints Optional epoxy primer where moisture comes up through the concrete
Main reinforcement Galvanized metal lath fastened to the plywood, plus a fiberglass mat with elastomeric acrylic resin in the intermediate coat Fiberglass mat saturated with elastomeric acrylic resin
Moisture primer option Not part of the listed plywood build-up Optional epoxy primer
Leveling layer Optional cement screed coat Not part of the listed concrete build-up
Top coat Finish people walk on, over the base and intermediate coats Polymer cement finish coat
Finish options Knock-down texture, custom textured finish, elastomeric acrylic color sealer (12 standard colors or custom colors), stain Same finish options as on wood
Fire rating (manufacturer) 1-hour, Class A 1-hour, Class A
Florida Building Code (manufacturer) Approved, ICC ESR-2097 Approved, including the High-Velocity Hurricane Zone
Other ratings (manufacturer) 6,000 psi, UV resistant Not covered in the listing summarized here

Which build-up fits my balcony?

What the deck is made of decides it. In the manufacturer's design, a plywood deck over wood framing takes the plywood build-up, and a concrete deck takes the Con-Dek build-up.

The plywood build-up suits:

  • wood-framed balconies and elevated decks with a plywood surface
  • decks where the surface is uneven enough to need the optional screed coat for leveling

The concrete build-up suits:

  • concrete balconies and decks
  • concrete decks where moisture comes up through the slab, which is when the optional epoxy primer comes in

An old coating can make it hard to tell what a balcony is built of. That is why the deck material is the first thing to check.

Why does the prep matter as much as the coating?

Preparation determines how well the system holds up, on wood or on concrete. A new coating over a failing surface starts with that problem built in.

At Cache Roofing, we get the deck ready before any coating goes on. Depending on what we find, that can mean:

  • removing failed coatings
  • replacing damaged decking
  • restoring concrete
  • repairing cracks
  • cleaning the surface

After coating, we seal the finished surface at the wall, at the edge and at every railing post. That way water runs off the balcony instead of into the framing.

If your balcony coating is wearing through, or you're unsure what lies beneath it, the next step is a visit from our crew. We'll check the deck material and its condition and give you a written estimate for the prep and system it needs. You can find more about our balcony and deck waterproofing.

Frequently asked questions

Do you waterproof balconies on condos and townhomes, or only on houses?

Cache Roofing waterproofs balconies and elevated decks on single-family homes, townhomes, condominiums, hotels, multi-family and commercial buildings.

Can you waterproof a rooftop deck or terrace that people walk on?

We waterproof rooftop decks and terraces built for foot traffic, as well as balconies, elevated decks and flat roofs.

Do you work near the beaches and in St. Johns County?

The areas we serve include Jacksonville Beach and Neptune Beach, and Atlantic Beach and Mayport, in Duval County. In St. Johns County, they include St. Augustine (including World Golf Village) and Ponte Vedra Beach (including Palm Valley and Nocatee).

About the author

The Cache Roofing Team writes from field experience on Northeast Florida roofs. Cache Roofing is a Florida certified roofing contractor (license #CCC1336213) based in Jacksonville. Learn more about the company.

(904) 887-7663

Get a Free Roof Estimate

Tell us about your roof. A member of the Cache Roofing team will contact you shortly.

By submitting this form you agree to our Privacy Policy and Terms of Service, and consent to be contacted by Cache Roofing by phone, email, or text message about your request. Message and data rates may apply. Reply STOP to opt out of texts.